DBEGoodFaith.com


Thompson Builders Corporation

Is seeking qualified DVBEs



Outreach Coordinator
Dalia Nieto

Telephone
(415) 456-8972

Fax
(415) 459-0665

Address
250 Bel Marin Keys Blvd., Bldg. A
Novato, CA 94949


Project Name
Laurel Elementary School - Finishing Kitchen

Bid/Contract #
Bid No. 13179

Awarding Agency
Oakland Unified School District

Project Location
Oakland, Alameda County, CA

Bid Date
04/11/2018 at 02:00

Project Details
The Project consists of:
Scope of work includes demolition, earthwork, asbestos abatement, lead material removal, mold remediation, below & above grade utilities, new sanitary sewer lateral to public street, concrete footings and slab, rough & finish carpentry, structural steel, structural anchors, plywood roof sheathing, building expansion joints, mechanical, electrical, plumbing, low voltage systems, exhaust hoods, fire suppression system, food service equipment, coiling roll-up counter door, doors & hardware, restroom fixtures & accessories, drinking fountain, bottle filling station, lockers, urethane cement
flooring, gypsum board, fiberglass reinforced panels, acoustical suspended ceiling, glue-on acoustical ceiling tiles, acoustical wall panels, attic access pull-down stairs, roof access ladder, rigid roof insulation, batt insulation, cabinetry, painting, exterior cement plaster, skylights, mineral cap built-up roofing, shingle composition roofing, roof safety tie-off anchors, roof gutters,
roof downspouts, asphalt paving, striping and markings, signage, chain-link fencing & gates.

Engineer's Estimate: $2,300,000

Goals: 3% DVBE
and 50% LBU (25% LBE/25% SLBE/SLRBE)

Seeking DVBE subcontractors/suppliers and truckers. Also seeking LBE/SLBE/SLRBE subcontractors/suppliers and truckers. Trades Needed but not limited to:
Division 02- Demolition (Earthwork; Selective Demolition; Hazardous Removal Specifications (Kitchen Additions); Hazardous Removal Specifications (Existing Multi Purpose Room); Mold Removal Specifications (Existing Multi Purpose Room))
Division 03- Concrete (Concrete Formwork; Reinforcing Steel; Cast-In-Place Concrete)
Division 05 - Metals (Structural Steel; Metal Fabrications; Miscellaneous Metal)
Division 06 - Wood and Plastic (Rough Carpentry; Sheathing; Finish Carpentry; Cabinetwork; Glass Fiber Reinforced Plastic Fabrications; Structural Composite Lumber)
Division 07 - Thermal and Moisture Protection (Insulation; Asphalt Shinigle Roofing; Built UP Roofing; Sheet Metal Flashing & Trim; Roof Accessories; Penetration Firestopping; Joint Firestopping; Sealants; Expansion Joint Cover Assemblies)
Division 08 - Openings (Hollow Metal Frames; FRP Flush Doors; Access Panels; Coiling Counter Door; Tubular Skylights; Door Hardware)
Division 09 - Finishes (Gypsum Board; Non-Structural Metal Framing; Lath and plaster; Acoustical Ceiling Tiles; Urethane Cement Composition Flooring; Fiberglass Reinforced Wall Panels; Acoustical Wall Panels;Painting)
Division 10 - Specialties (Signage; Toilet Room Accessories; Fire Protection Specialties; Lockers)
Division 11 - Equipment (Foodservice Equipment)
Division 21 - Fire Suppression (Fire Suppression System)
Division 26 - Electrical (Basic Electrical Requirements; Basic Electrical Materials and Methods; Service and Distribution System; Lighting; Fire Alarm System)
Division 27 - Communications (Networking/Telecommunication System)
Division 32 - Exterior Improvements (Asphalt Paving and Resurfacing and Markings; Chain Link Gates)

Please submit bids to us by noon on bid day.

We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement. Certification of insurance for General Liability and Workers Compensation are required. A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors faithful performance and payment bonds in the amount of the subcontract price will be required. Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation. TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Plans and specs may be viewed in our office at 250 Bel Marin Keys Blvd., Bldg. A, Novato Monday through Friday from 7:30 AM to 4:30 PM or can be e-mailed upon request.
Plans and specs may be downloaded from the link: https://tpcorp.box.com/s/881hc5o5znnkjm6s9az0c13qnxlwo5lj
*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.

How to get in touch


Outreach Coordinator
Dalia Nieto

Telephone
(415) 456-8972

Fax
(415) 459-0665

Address
250 Bel Marin Keys Blvd., Bldg. A
Novato, CA 94949