Project Name
CATSKILL AQUEDUCT REPAIR AND REHABILITATION

Bid/Contract #
WFF-CAT-RR

Awarding Agency
NYCDEP

Project Location
New York , Various County, NY

Bid Date
12/31/2018 at 11:30

Project Details
Owner: NYCDEP
LOW BIDDER : SCHIAVONE CONSTRUCTION - 3/27/18 Duration: 1096 CD Project Goal: M/WBE 20%

http://sccftp.schiavone.net/
User name: guest932
New Password: 5s34qswD


PROJECT DETAILS
Schiavone Construction is looking for M/WBE participation thru the life of this project. This project is a start of 74 Miles, 5 Counties and 17 Towns beginning in Pleasantville - Olive, NY, Ulster, Putnam, Orange and Westchester, NY.

Project: Contract: WFF-CAT-RR, CATSKILL AQUEDUCT REPAIR AND REHABILITATION

If you are interested in reviewing contract documents, contact Colleen Connors-Casenta at cconnors@schiavone.net for a copy

Disciplines of work but not limited to:
Division 1 :
- Photography and Videos
- Permits
- Security Guards
- CPM
- Engineer's Office Maintenance and Supplies
- Engineers Field Office Trailers
- Records in Microfilm
- Cleaning Services
Division 2 :
- Chemical Sampling and Analysis of Soils
- Removal and Disposal of Asbestos, Lead, PCB's, and Mercury Contain Materials
Division 3 :
- Rebar
- Ready Mix Concrete
- Shotcrete
Division 5 :
- Miscellaneous Metals
Division 9 :
- Painting and Coating
Division 13 :
- Temporary Water System
- Metal Canopy System
Division 22 :
- PVC Pipe
Division 26
- Electrical
Division 31
- Clearing and Grubbing
- Dewatering
- Site Preparation, Maintenance and Restoration
- Water Treatment and Disposal
- Chemical Grouting
- Fiber Reinforced Polymer Lining
- Contact Grouting
Division 32
- Precast Soldier Pile and Lagging Retaining Wall
- Planting
Division 33
- Leakage and Pressure Tests
- Ductile, Cast, Copper Piping
- Mechanical Pipe Plugs
Division 35
- Diving Services
Division 40
- Steel and Stainless Steel Pipe and Fittings
- Valves
- Instruments

Provide References on past/current projects if you have not provided previously along with your EMR (Safety rating).

Please provide a price proposal to Furnish/Install or Supply your scope or supply of work including but not limited to work and jobsite delivery; all in accordance with and conforming to the project contract documents and additional requirements necessary to complete the work as specified herein. The referenced work scope shall also be performed to comply with the requirements of the project schedule, milestones, including work
staging and phasing, work restrictions and constraints, site access conditions and be coordinated with all other aspects of the project.

Confidential Information:
Keep all information furnished Confidential. Confidential Information includes specifications, drawings, plans, diagrams, sketches, renderings and other technical data and information.

Please advise what work you are coded for along with description .

Thank you in advance for your cooperation.

Questions or concerns may be addressed via email to cconnors@schiavone.net.

Schiavone is an Equal Opportunity Employer/Contractor.

Your participation is greatly encouraged and appreciated.

How to get in touch


Outreach Coordinator
Colleens Connors-Casenta

Project Estimator
Brian Magh

Telephone
(201) 867-5070

Fax
(000) 000-0000

Address
150 Meadowlands Parkway, 2nd Floor
Secaucus, NJ 07094