DBEGoodFaith.com


Skanska-Ames, a Joint Venture

Is seeking qualified DBE



Outreach Coordinator
Stacey Jeffers

Project Estimator
Ken Epps

Telephone
(951) 684-5360

Fax
(951) 788-2449

Address
1995 Agua Mansa Road
Riverside, CA 92509


Project Name
I-15 Design Build Express Lanes Project

Bid/Contract #
RFP No.: 16-31-057-00

Awarding Agency
Riverside County Transportation Commission (RCTC)

Project Location
Various, Riverside County, CA

Bid Date
01/10/2017 at 02:00

Project Details
I-15 DESIGN BUILD EXPRESS LANES PROJECT

Subcontractor Proposal Due Date: December 15, 2016 @ 2:00 PM
Prime Contractor Bid Proposal Due Date: January 10, 2017@ 12:00 PM
Website: www.skanska-ames.com

Skanska-Ames, a Joint Venture (SAJV) is interested in soliciting in Good Faith all subcontractors as well as certified DBE subcontractors related to the scopes of work below for the I-15 Design Build Express Lanes Project. Quotes will be requested from Subcontractors, Vendors, Professional Service and Trucking firms..
To request access to contract documents, & register as an interested bidder, email: Bids.Socal@Skanska.com
All Quotes are due Thursday, December 15, 2016 so that all bids/proposals can be fairly evaluated.

Requested scopes include, but are not limited to the following and should be based on the 16-31-057-00 RFP and its amendments.

Subcontractors: AC Dike, AC Paving, Barrier Rail Median, Barrier Rail Shoulder, Box Culverts, Clear & Grub, Cold Plane AC, Concrete Barrier, Concrete Flatwork, Concrete Paving (JPCP), Construction Area Signs, Demolition, Driven Pile, Drainage Systems & Structures, Electrical / ITS / Signals, CIDH Pile, Erosion Control / Hydro-seeding, Fencing, Grind PCC Pavement, Grinding, Ground Improvements, Guardrail, HDPE Pipe, Joint Seals, Landscape, Materials Testing, Milling, Masonry Sound Walls, Metal Beam Guard Rail, Post Tensioning, Rebar Furnish & Install, Roadway Signs, Rumble Strip, Saw Cutting, Sign Structures, Slope Paving, Soil Nail/Tieback, Soldier Pile, Striping & Markings, Survey (Construction), SWPPP, Traffic Control, Trucking, Underground Utilities

Material Suppliers: Base & Aggregates, Asphalt, Bridge Elastomeric Bearings, Bridge Expansion Joints, Cement and Admixtures, Concrete Form Liner, Concrete Form Materials, Concrete Pumping, Concrete Ready Mix, CMP, Deck Drains, Drainage Structures, Erosion Control Material, Geogrid, Geotextile Fabric, Pavement Dowels/Baskets, Pipe, Rebar, RCP, Temp. Barrier, Traffic Control Devices

Services/Vendors: Monitoring: Sound, Vibration, Geo & Air Quality, Security, Office Supplies, Reprographics, Sweeper Truck, Water Trucks, Jobsite Sanitation, Janitorial, SWPPP, Progress Photography, Catering, QA/QC, Testing & Inspection, Doc. Control

Assistance: SAJV will assist qualified subcontractors, vendors, & suppliers in obtaining bonding, lines of credit, insurance, necessary equipment, materials and/or supplies. If you are a DBE Company, please provide your certification letter with your proposal. If you are a non-DBE, please indicate all lower-tier participation on your quotation as it will be evaluated with your price. In order to assist DBE subcontractors and suppliers, we will divide total requirements into smaller packages, tasks or quantities & establish delivery & construction schedules which will permit maximum participation when feasible.
Subcontracting Requirements: SAJV’s insurance requirements are Commercial General Liability (GL): $1M ea. occ., $1M personal injury, $2M products & completed operations agg. & general agg.; $1M Auto Liability; $5M Excess/Umbrella and $1M Workers Comp. Endorsements and waivers required are the Additional Insured End., Primary Wording End., & a Waiver of Subrogation (GL & WC). Other insurance requirements may be necessary per scope or RFP requirement. Subcontractors may be required to furnish performance & payment bonds in the full amount of their subcontract by an admitted surety & subject to approval by SAJV. SAJV will pay bond premium up to 1%. Quotations must be valid for the same duration as specified by the Owner for contract award. Conditions or exceptions in Subcontractor’s quote are expressly rejected unless accepted in writing. SAJV is signatory to the Operating Engineers, Laborers, Cement Masons, & Carpenters Unions. Subcontractors must provide weekly, one original and one copy of all certified payrolls, including non-performance and fringe benefit statements if required by law or by the Prime Contract

This contractor and subcontractor(s) shall abide by the requirements of 41 CFR 60-300.5(a) and 60-741.5(a). These regulations prohibit discrimination against qualified individuals on the basis of protected veteran status or disability, and require affirmative action by covered prime contractors and subcontractors to employ and advance in employment qualified protected veterans and individuals with disabilities.

How to get in touch


Outreach Coordinator
Stacey Jeffers

Project Estimator
Ken Epps

Telephone
(951) 684-5360

Fax
(951) 788-2449

Address
1995 Agua Mansa Road
Riverside, CA 92509